Welcome to Eco Trade Supplies. All product Pricing inclusive of VAT

SolarEdge  |  SKU: SE-66600-FUSE-FULL

66.6kW Synergy Manager FUSE DC Switch, MC4, DC SPD, Fuses

£4,173.83 £4,493.70
Tax included Shipping calculated at checkout.


Delivery and Shipping

Next Business Day Delivery On Order placed Before 12:00 PM

Except Ireland, highlands and Islands.

Returns and Refunds

  • We have a 14-day return policy, which means you have 14 days after receiving your item to request a return.
  • We will process your refund typically within 3-5 working days of receipt and assessment of returned goods.

- See our Returns and Refund policy for more detail -

This part is made up of the following items:
2 x SE-SYNERGY-RSD Synergy Secondary Unit with RapidShutdownDevice
1 x SE-66600-MNGR-F 66.6kW Synergy Manager FUSE DC Switch, MC4, DC SPD, 25A Fuses

Three Phase Synergy Inverter

Main features:

  • Pre-commissioning feature for automated validation of system components and wiring during the site installation process and prior to grid connection.
  • Easy 2-person installation with lightweight, modular design (each inverter consists of 2 or 3 Synergy Units and one Synergy Manager).
  • Independent operation of each Synergy Unit enables higher uptime and easy serviceability.
  • Built-in thermal sensors detect faulty wiring ensuring enhanced protection and safety.
  • Built-in arc fault protection and optional rapid shutdown (depending on Synergy Manager used)
  • Built-in PID mitigation for maximized system performance.
  • Monitored and field-replaceable surge protection devices: integrated RS485 and Type 2 DC SPDs, optional Type 2 AC SPD.
  • Integrated DC safety switch eliminates the need for external DC isolators.
  • DC Fuses (Single Pole) 25A, optional required for more than 3 strings only
25Amp fuse is NOT compatible with the S1200 optimisers. 30Amp fuse (per phase) replacement is required for this inverter to work with the S1200 optimiser.
Please note FULL parts consist of 1x Synergy Manager and 2x Synergy Units ( 3x for 90 and 100kW)
Some documents are currently missing. These will be added as soon as available.

If you have any technical queries about this product or wish to report any issues with the information on this page then please use the Contact Form to contact us.
Weight:
82 kg
Rated Power:
66,600 W
Min PPT Voltage:
0 V
Max PPT Voltage:
0 V
DC Startup Voltage:
0 V
DC Shutdown Voltage:
0 V
Max Input Voltage:
1,000 V
Max DC Power:
100,000 W
Max AC Power (5 Minutes):
66,600 W
Surge AC Power (1 Second):
66,600 W
Max DC Current:
80 A
Max DC Inputs:
6
Has DC Fuses:
12
Connector:
MC4
Included Connectors:
12
Euro Efficiency:
98 %
Transformer:
None
MPPT Quantity :
0
Has Integrated DC Switch:
Yes
Warranty:
12 years
Use our quick configurator tool to identify possible panel and inverter configurations: Quick Config

Optional other parts
One of the followingWarranty Extension
SE-WAR-20Y-MNGR-50-80K 66.6kW Synergy Manager FUSE DC Switch, MC4, DC SPD, Fuses
Possible Alternatives
SE-66600-BASE-FULL 66.6kW Synergy Manager BASE No DC Switch, MC4, DC SPD
SE-66600-SWITCH-FULL 66.6kW Synergy Manager SWITCH DC Switch, MC4, DC SPD
SE-50000-FUSE-FULL 50kW Synergy ManagerFUSE DC Switch, MC4, DC SPD, Fuses

Payment & Security

Payment methods

  • American Express
  • Apple Pay
  • Diners Club
  • Discover
  • Google Pay
  • Klarna
  • Maestro
  • Mastercard
  • PayPal
  • Shop Pay
  • Union Pay
  • Visa

Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.

Ecotrade supplies
66.6kW Synergy Manager FUSE DC Switch, MC4, DC SPD, Fuses
SolarEdge

66.6kW Synergy Manager FUSE DC Switch, MC4, DC SPD, Fuses

£4,173.83 £4,493.70
This part is made up of the following items:
2 x SE-SYNERGY-RSD Synergy Secondary Unit with RapidShutdownDevice
1 x SE-66600-MNGR-F 66.6kW Synergy Manager FUSE DC Switch, MC4, DC SPD, 25A Fuses

Three Phase Synergy Inverter

Main features:

  • Pre-commissioning feature for automated validation of system components and wiring during the site installation process and prior to grid connection.
  • Easy 2-person installation with lightweight, modular design (each inverter consists of 2 or 3 Synergy Units and one Synergy Manager).
  • Independent operation of each Synergy Unit enables higher uptime and easy serviceability.
  • Built-in thermal sensors detect faulty wiring ensuring enhanced protection and safety.
  • Built-in arc fault protection and optional rapid shutdown (depending on Synergy Manager used)
  • Built-in PID mitigation for maximized system performance.
  • Monitored and field-replaceable surge protection devices: integrated RS485 and Type 2 DC SPDs, optional Type 2 AC SPD.
  • Integrated DC safety switch eliminates the need for external DC isolators.
  • DC Fuses (Single Pole) 25A, optional required for more than 3 strings only
25Amp fuse is NOT compatible with the S1200 optimisers. 30Amp fuse (per phase) replacement is required for this inverter to work with the S1200 optimiser.
Please note FULL parts consist of 1x Synergy Manager and 2x Synergy Units ( 3x for 90 and 100kW)
Some documents are currently missing. These will be added as soon as available.

If you have any technical queries about this product or wish to report any issues with the information on this page then please use the Contact Form to contact us.
Weight:
82 kg
Rated Power:
66,600 W
Min PPT Voltage:
0 V
Max PPT Voltage:
0 V
DC Startup Voltage:
0 V
DC Shutdown Voltage:
0 V
Max Input Voltage:
1,000 V
Max DC Power:
100,000 W
Max AC Power (5 Minutes):
66,600 W
Surge AC Power (1 Second):
66,600 W
Max DC Current:
80 A
Max DC Inputs:
6
Has DC Fuses:
12
Connector:
MC4
Included Connectors:
12
Euro Efficiency:
98 %
Transformer:
None
MPPT Quantity :
0
Has Integrated DC Switch:
Yes
Warranty:
12 years
Use our quick configurator tool to identify possible panel and inverter configurations: Quick Config

Optional other parts
One of the followingWarranty Extension
SE-WAR-20Y-MNGR-50-80K 66.6kW Synergy Manager FUSE DC Switch, MC4, DC SPD, Fuses
Possible Alternatives
SE-66600-BASE-FULL 66.6kW Synergy Manager BASE No DC Switch, MC4, DC SPD
SE-66600-SWITCH-FULL 66.6kW Synergy Manager SWITCH DC Switch, MC4, DC SPD
SE-50000-FUSE-FULL 50kW Synergy ManagerFUSE DC Switch, MC4, DC SPD, Fuses
View product